One of the key challenges of this project was ensuring the air-conditioning system not only integrated smoothly with the existing infrastructure but was also completed within a tight deadline, which included access limitations to the site. The system had to be both energy-efficient and fully functional, with no disruption to the daily operations of the building.
After evaluating the site and operational needs, Grotec recommended a tailored air-conditioning solution that would integrate seamlessly with the building’s existing operational setup. The system installation was carried out to exacting standards, fully aligned with the design brief, and included the integration of key components such as the Mains Switchboard, Variable Refrigerant Flow (VRF) system, explosion-proof fans, fresh air fans, cowls, grills, and dampers. All components were connected to and centrally controlled via a unified system, ensuring smooth, coordinated operation across the entire site.